PT PP Media Center
   

Share This Page

News

Peresmian Dermaga IV Merak-Bakauheni
13 October 2020

Inauguration of Merak-Bakauheni Dock IV


PT PP (Persero) Tbk (“the Company”) has successfully completed the construction of the Jetty IV project for Merak crossing - Bakauheni. The pier construction project was inaugurated by Budi Setiyadi as Director General of Land Transportation of the Ministry of Transportation. The inauguration procession was carried out by cutting the symbolic flower ribbon. The inauguration ceremony was also attended directly by M. Toha Fauzi as Director of Operations 2 and Pande Ketut as SVP of the Company's 2nd Infrastructure Division. In addition, the inauguration ceremony was also attended by the President Director of PT ASDP (Persero) Ira Puspadewi, Head of Banten Police, Irjen. Police Drs. Fiandar, Mayor of Cilegon Edi Ariadi, etc. The inauguration ceremony was held at Merak Pier, Banten on Monday (12/10) by strictly implementing the Covid-19 health protocol.

The project for the construction of Pier IV at the Merak Crossing Port - Bakauheni is owned by PT ASDP Indonesia Ferry (Persero) with a project implementation period of 365 (three hundred and sixty five calendar days). Merak IV Jetty has a capacity of 6,000-10,000 GRT with the Breasting Dolphin pier type and a pier length of 120 meters. Meanwhile, Demaga IV Bakauheni has a capacity of 6,000-10,000 GRT with a Quay Wall pier type and a pier length of 150 meters.