PT PP Media Center
   

Share This Page

News

PTPP Tandatangani Bendungan Way Sekampung Paket 3
09 September 2020

PTPP Signs Way Sekampung Dam Package 3

PT PP (Persero) Tbk (“the Company”) was again trusted by the Ministry of PUPR to build the Way Sekampung Dam Package 3 . The contract signing ceremony was held at the Mesuji Sekampung River Basin Office in Bandar Lampung today Wednesday (09/09). Besides being done face-to-face, the signing ceremony was also done virtually. In the signing of the Cooperation contract, the SVP Infrastructure 2 of the Company Pande Ketut was also present to represent the Company while from the Ministry of Public Works and Housing was attended by the Head of the Mesuji River Basin Region, Sekampung Abdul Muis.

Previously, the Company was trusted to work on the Way Sekampung Dam Package 1 construction project in 2015. Success in carrying out the work in Package 1, the Company was again trusted by the Ministry of PUPR to redo the construction of the Sekampung Package 3 Dam.

The Way Sekampung Dam project, which is owned by the Ministry of PUPR, is located in Pringsewu Regency, Lampung Province. The construction of this project is funded by APBN and carried out with an implementation period of 8 (eight) months. The scope of work carried out by the Company in Package 3 includes: preparatory work, olak pond work, left access road work, hydropower access road work and clearing of inundated areas. With the Way Sekampung Dam, it is hoped that it can meet the needs of raw water supply, irrigation water, flood control, and even become a new tourist attraction in the city of Bandar Lampung.